Skip to main content

Changelog

v1.0.0
09-May-2025
Indonesia 1-node and 7-node models added to Scenario Builder
v1.3.7
03-Oct-2025
Costs data has been updated for batteries
Installed capacities updated for hydro and gas
Demand profiles updated

Model scope

  • Base year: 2023
  • End year: 2050
  • Spatial resolution:
    • National (1-node)
    • Regional (7-nodes island-wise):
      • Java (IDN-JW)
      • Sumatra (ISN-SM)
      • Bali and Nusa Tenggara (IDN-NU)
      • Kalimantan (IDN-KA)
      • Sulawesi (IDN-SL)
      • Maluku (IDN-ML)
      • Papua (IDN-PP)
  • Temporal resolution:
    • Low resolution (24-hourly and yearly) - 1 Timeslice
    • Medium resolution (3-hourly and 3-monthly) - 32 Timeslices

Data sourcing table

Input variableData sourceData standard
Demand profiles - currentShape of the demand at the national-level synthetically generated from a historical year (2015)Silver
Demand profiles - futureShape of the demand profile does not change in the future.Bronze
Annual demand - currentCASE Indonesia (https://caseforsea.org/indonesia/)Gold
Annual demand - futureCASE Indonesia (https://caseforsea.org/indonesia/Gold
Renewable profiles - currentTransitionZero in-house methodology (https://www.transitionzero.org/insights/from-vision-to-voltage-with-tz-apg)Silver
Renewable profiles - futureShape of the renewable profiles does not change in the future.Bronze
Renewable potentialsTransitionZero in-house methodology (https://www.transitionzero.org/insights/from-vision-to-voltage-with-tz-apg)Bronze
Technology costs - currentDanish Energy Agency and The Ministry of Energy and Mineral Resources of IndonesiaGold
Technology costs - futureDanish Energy Agency and The Ministry of Energy and Mineral Resources of IndonesiaGold
Interconnector technology costs - currentTransitionZero in-house methodology (https://www.transitionzero.org/insights/from-vision-to-voltage-with-tz-apg)Silver
Interconnector technology costs - futureTransitionZero in-house methodology (https://www.transitionzero.org/insights/from-vision-to-voltage-with-tz-apg)Silver
Commodity costs - currentTransitionZero in-house methodology (https://www.transitionzero.org/insights/from-vision-to-voltage-with-tz-apg)Silver
Commodity costs - futureTransitionZero in-house estimates (https://www.transitionzero.org/insights/from-vision-to-voltage-with-tz-apg)Silver
Domestic interconnector capacity data - currentGovernment of Indonesia (RUKN 2025-2060)Gold
Domestic interconnector capacity data - futureTransitionZero in-house methodology (https://www.transitionzero.org/insights/from-vision-to-voltage-with-tz-apg)Silver
Electricity cross border trade cost - currentMarginal cost of neighboring countries exporting electricity to/from Indonesia based on TZ APG studyBronze
Electricity cross border trade cost - futureMarginal cost of neighboring countries exporting electricity to/from Indonesia based on TZ APG studyBronze
Efficiency / LossesDanish Energy Agency and The Ministry of Energy and Mineral Resources of IndonesiaSilver
Minimum generation levelDefault, technology-specificBronze
Planned outages / AvailabilityNREL ATB 2024Bronze
Discount rateDefault (5%)Bronze
WACCIEA Cost of Capital ObservatoryBronze
Power plant data (location, capacity, fuel, technology, start year, end year)Data served as initial and planned capacities from 2023 to 2050. This data is curated and validated by TransitionZero. The base dataset is from Global Energy Monitor with enhancements from “additional asset sources”. See the following: RUPTL 2021-20230Gold