Skip to main content
The Pakistan regional model is uncalibrated. It has not been through TransitionZero’s model calibration standard, so results have not been checked against historical capacities, generation, emissions, or trade. Use it for exploratory analysis out of the box, and calibrate it for modelling work.

Changelog

13 Jul 2026
The Pakistan 3-node model (K-Electric, South, North-Central) has been added. Note that the 3-node structure is a regional aggregation used in the results plots and the underlying model still runs at the individual asset/plant level. Users can drill into these asset-level results via the downloadable CSV file.
19 Jan 2026
Support for Pakistan dispatch scenarios
04 Dec 2025
Pakistan 1-node model added to Scenario Builder

Model scope

Capacity Expansion

  • Base year: 2023
  • End year: 2050
  • Spatial resolution:
    • National (1-node)
    • Regional (3-nodes):
      • North-Central (GRIDREGION-PAK-NC)
      • South (GRIDREGION-PAK-SO)
      • K-Electric (GRIDREGION-PAK-KE)
  • Temporal resolution:
    • Low resolution (24-hourly and yearly) - 1 timeslice
    • Medium resolution (3-hourly and 3-monthly) - 32 timeslices

Dispatch

  • Spatial resolution:
    • National (1-node)
    • Regional (3-nodes):
      • North-Central (GRIDREGION-PAK-NC)
      • South (GRIDREGION-PAK-SO)
      • K-Electric (GRIDREGION-PAK-KE)
  • Temporal resolution:
    • High resolution (hourly and single year) - 8760 timesteps
    • Available for single years between 2023-2050

Data sourcing table